First Name: Ghorbanmohammad
Last Name: Komaki
Address: No, 17,first floor, bulding No. 2,Shahryar township,
Kamarbandi St. Gorgan City, Golestan Province - Iran.
Telephone: ++98-(171)-6624662
Personal Information |
|
§ Birth Date: 9 April 1983 |
§ Marriage status: Single |
Education |
|
§ 2007 – 2009 Mazandaran University of Science & Technology, Babol, Iran. M.Sc. in Industrial Engineering GPA: 17.35 / 20 Relevant graduated courses: Nonlinear Optimization Scheduling Theory Advanced Integer Programming Dynamic Programming Advanced Engineering Economy Advanced Operation Research § 2002 – 2007 Sharif University of Technology, Tehran, Iran. B.Sc. in Industrial Engineering (IE) GPA: 14.75 / 20 (the average of IE department is about 13.50) Relevant graduated courses: Operation Research (I & II) Probability Theory Engineering Economy Quality Control Queuing Theory Project Control Discrete Events Simulation Product & Inventory Control (I & II) System Analysis Advanced Manufacturing Process
§ 1997 – 2001 Diploma in Mathematical & physics ( The best high school ( Nemuneh ) in Goonbad-e-kavous- "Baghiet-o-Allah ) GPA: 18.87 / 20 |
|
Teaching Experience |
|
§ Summer – 2010; Lecturer at Community colleague of of Application science and Technology, Gorgan, Iran. Quality Management System Analysis and Design § Spring semester 2010 ; Lecturer at Community colleague of Application science and Technology, Gorgan, Iran. System Analysis and Design
|
|
Research Interests |
|
Operation Research Scheduling and Simulation Project Management, Risk Management ERP & MRP (Integrated Systems) Total Quality Management (TQM ) Supply Chain management
|
|
Honors and Awards |
|
§ Ranked 240th among approximately 200000 applicants for university entrance exam for M.Sc. in 2007. § Ranked 2100th among approximately 1,500,000 applicants for university entrance exam in 2001. § 3th champion of university volleyball § The best student during high school § Best Goalkeeper in High school Champion of town |
|
Theses |
|
§ M.Sc. thesis: Effective hybrid Meta-Heuristic Algorithm for the Hybrid Flow Shop Scheduling, (Under Supervision of Prof. Jolai (Dean of industrial Dep. Of Tehran Uni.)) (Score 20/20). § B.Sc. thesis: Risk management case study Based on PMBOK ®2004, (Under Supervision of Prof. Shadrokh (professor in Sharif Uni.)) (Score 20/20). |
|
Publication and Papers |
|
§ Jolai, F., Komaki G.M., Javadi, B. "Hybrid flowshop Scheduling Problem", Submitted to Manufacturing Advanced Technology, July 2009. (Under referring). § Mahdavi, Iraj, Kayvanfar V., Komaki G.M., "Minimizing total tardiness and earliness problem with controllable processing times using an effective heuristic", CIE40: The 40th Inter. Conference on Computers & Industrial Engineering July 25-28, 2010; Awaji Island, Japan. § Jolai, F., Komaki G.M., Javadi, B. "An Effective Hybrid Metaheuristic Algorithm for Hybrid flowshop Scheduling Problem", the 3th international conference of Iranian operations research society, Tehran, Iran, May 5-6, 2010. § Kayvanfar V., Komaki G.M., " An effective heuristic to JIT approach with controllable processing time", the 3th international conference of Iranian operations research society, Tehran, Iran, May 5-6, 2010. § Shadrokh Shahram, Komaki G.M.”Project Risk Management Case Study”,4th International Project Management Conference, Tehran, Iran.(In Persian) |
|
Computer skills |
|
Ms Office (Word, Excel, PowerPoint, Access ) Case Tools ( System Architect ) Project Control (MSP, Primavera) Programming (MATLAB,VB6, Lingo,Gams,Lindo) Simulation (Vensim, Arena) Risk Analysis (@risk, Pertmaster) OS ( Windows XP,98) |
|
Language skills |
|
§ English (IELTS: 6.5) § Farsi (Official Language of Iran):Excellent |
§ Turkish: Excellent § Turkmen (Mother Tongue): Excellent |
Hobbies |
|
§ Playing football, volleyball § Jogging |