EDUCATION

  1. M.Sc. in Mechanical Engineering (Manufacturing), Sharif University of Technology, 2002, 2004. Thesis: Computer Aided Tolerancing Based on Assembly Tolerance Analysis.

Total GPA: 17.45/20.

  1. B.Sc. in Mechanical Engineering (Manufacturing), Tabriz University, 1998, 2002. Thesis: Developing Software to Design Gears.

Total GPA: 14.75/20.

Specialized GPA: 15.19/20.

  1. High School Diploma in Mathematics and Physics, 1994, 1998.

Total GPA: 17.04/20.

HONORS

1.      Ranked 2nd in M.Sc. graduated level in major of Manufacturing (Mechanical Engineering) in Sharif University of Technology, 2004.

2.       Ranked 12th in university entrance exam for M.Sc. degree (in major of Manufacturing), among 6628 participants, Iran, 2002.

3.      Ranked 2nd in high school diploma among all high school students of the city of Shahryar of Tehran province, 1998.

RESEARCH INTERESTS

1.      Concrete transportation systems design and manufacturing

2.      Crane design (lattice boom cranes, bridge cranes)

3.      Formworks design

4.      Heavy duty machineries design and manufacturing

5.      Automation in construction

6.      Blanking die design

7.      Cutting and bending die design

8.      Jacquard machine design

9.      Software Programming

10.  Human body modeling

11.  Agricultural machinery design

PUBLICATIONS

1.      Bathaee, K. and Gholami, M. Design Process of change of functioning of a Power Shovel to a Lattice Boom Crane of 300, ton Capacity, Accepted in SAE 2016 Commercial Vehicle Engineering Congress, Rosemont, Illinois, USA

2.      Bathaee, K. and Gholami, M. Design conveyor belt with 5 DOF that connected to lattice boom crane for transporting concrete, Accepted in SAE 2016 Commercial Vehicle Engineering Congress, Rosemont, Illinois, USA

3.      Bathaee, K. and Gholami, M. Design a lattice boom crane of 480 tons lifting capacity, Proceedings of 24st Annual International Conference on Mechanical Engineering, ISME2016, Yazd university, Yazd, Iran, 26, 28 April, 2016.

4.      Bathaee, K. and Gholami, M. Design bucket chain elevator for transporting digging materials in Tohid tunnel, Proceedings of 24st Annual International Conference on Mechanical Engineering, Yazd university, Yazd, Iran, 26, 28 April, 2016.

5.      Bathaee, K. and Gholami, M. New concreting method using tower belt system, Proceedings of 21st Annual International Conference on Mechanical Engineering, ISME2013, K.N. Toosi University of Technology, Tehran, Iran, 7, 9 May 2013.

6.      Bathaee, K. and Gholami, M. The design process of topbelt for transporting concrete, Proceedings of 20th Annual International Mechanical Engineering Conference, ISME2012, Shiraz University, Shiraz, Iran, 15, 17 May 2012.

7.      Gholami, M. and Movahhedy, M.R. Tolerance analysis of the trigger mechanism assembly using direct linearization method, Journal of Solid Mechanics in Engineering, Vol. 2 (2), p. 1, 9, 2010.

8.      Movahhedy, M., Atharifar, H., and Gholami, M. Intelligent tolerance allocation for a high duty brake, SAE Technical Paper 2005, 01, 0508, 2005, doi: 10.4271/2005010508.

9.      Movahhedy, M. R., Gholami, M. and Atharifar, H. Tolerance analysis for assembly function, Proceedings of 12th International Conference of Mechanical Engineering, ISME2004, Tarbiat Modares University, Tehran, Iran, 7, 9 May 2004 (in Farsi).

10.  Movahhedy, M., Atharifar, H. and Gholami, M. Effects of tolerance analysis and synthesis in reverse engineering, 1st Conference of Reverse Engineering, Tehran, Iran, April 2004 (in Farsi).

SOFTWARE PROFICIENCY

12.  Autodesk Inventor

13.  Super Forge

14.  Mechanical Desktop

15.  Ansys (Workbench & Multi physics)

16.  Auto Cad

17.  MATLAB, Simulink (Simmech)

18.  Solid Works

19.  Visual Basic , Visual C++

20.  Working Model , MSC. Visual Nastran

21.  VBA

22.  Microsoft Office (Word, PowerPoint, Excel)

23.  MakerBot

PROFICIENCY CERTIFICATES

1.      Welding Workshop on Structural Engineering, K. N. Toosi University of Technology, May 2004.

2.      CAT 966 GII Loaders Hydraulic System, Hamkar Machine Training Dep., May 2005.

3.      CAT 966 GII Loaders Power Train System, Hamkar Machine Training Dep., May 2005.

WORK EXPERIENCE

1.      Researcher, Sharif University of Technology, Research Office, Tehran, Iran, 2003, 2004, http://research.sharif.ir/home

2.      Manager of Machinery Design and Manufacturing Section, Perlite Construction Company, Tehran, Iran, 2005,present, http://www.perlite, co.com.

3.      Advisor in Jacquard Machine Design, Namadparda Company, Tehran, Iran, 2012, present, http://www.namadparda.com.

4.      Designer (of a sliding formwork for Amirkabir Tunnel), Koohyar Ararat Company, Tehran, Iran, 2011, 2012, http://koohyar.com/.

 

PATENTS

SELECTED ACCOMPLISHED PROJECTS

1.      Tolerance analysis software

5.      Design of tolerance analysis software and adding it, as a new menu, to Autodesk Mechanical Desktop toolbox (M.Sc. thesis), Sharif University of Technology, Research Office, 2003, 2004.

 

26

Tolerance analysis menu, designed and added to Mechanical Desktop

 

2.      300, ton capacity lattice boom crane

Design of a 300, ton capacity lattice boom crane, using a scrapped shovel (Bucyrus RB, 195), Perlite Construction Company, 2005, 2007.

 

PICT0340

PICT2894

PICT0040

Scrapped shovel and its changes to a 300, ton lattice boom crane

5

1

PICT0496

PICT0509

The 300, ton crane working in Seymareh Dam, Ilam, west of Iran

 

.

3.      A Conveyor assembly to expedite concreting

  1. Design and supervising the fabrication of conveyor belts for transporting concrete in Seymareh Dam, Ilam, west of Iran, Perlite Construction Company, 2005, 2006. The conveyor belt (42, meter length) was connected to a Manitowoc Crane with a 2DOF mechanism. The two conveyors (topbelt) were connected to each other by means of a middle swing (Swing2). Swing2 provided the possibility of a 2, DOF motion and controlled rotational angle of conveyor2. The conveyors assembly was connected to the crane by Swing1 which provided 1, DOF motion. Topbelt was suspended from two hooks which had been controlled separately.

Using a conveyor assembly (topbelt) attached to a lattice boom crane for transporting concrete, was the first of its kind.

 

Main parts of the topbelt attached to the crane

Topbelt and the crane transporting concrete, Seymareh Dam, west of Iran

 

  1. Design and supervising the fabrication of a conveyor belt for transporting concrete (60, meter length) connected to a tower crane, Liebherr HC550, to expedite concreting procedure in Seymareh Dam, Ilam, west of Iran, Perlite Construction Company, 2007, 2008. The two conveyors of the tower belt were connected to each other by means of a Middle Swing, which was equipped with a break mechanism to control relative angle of these two conveyors.

FEM analysis of the tower belt main parts used to work in cooperation with tower crane and manufacturing process

Tower belt CAD design and location of its fabricated system, concreting in Seymareh Dam, West of Iran

 

4.      Chain bucket elevator

Design and supervising the fabrication of chain bucket elevators of 36, meter height (3 units) and also of 42, meter height (3 units) for removing excavated soil from Towheed Tunnel access shafts with a lifting volume of 45, 65 m3/h, Tehran, Iran, Perlite Construction Company, 2008, 2009.

 

Chain bucket elevators in Towheed Tunnel access shafts, Tehran, Iran

Chain bucket elevators in Towheed Tunnel access shafts, Tehran, Iran

 

5.      Telescoping system for rising tower crane

Design and supervising the fabrication of a tower crane telescoping system to raise/lower a tower crane of 1000, ton, meter capacity (MD1000 Potain), Seymareh Dam, Ilam, Perlite Construction Company, 2010, 2011.

FEM analysis and manufacturing  of  Telescoping system component

Telescoping system assembly, Seymareh Dam, West of Iran

 

6.      Sliding formwork of a tunnel

Design of a sliding formwork for Amirkabir Tunnel, Tehran, Iran, Koohyar Ararat Company, 2011, 2012..

CAD modeling and  FEM analysis of the formwork

fabricated formwork, Amirkabir Tunnel, Tehran, Iran

 

 

 

7.      A bogie for mobility of tower cranes

Design of a bogie to move LIEBHERR 630 EC, H40 tower cranes for TAT Commercial Complex Project, Perlite Construction Company, 2012, 2013.

 

8.      Gantry cranes

Design and supervising the fabrication of gantry cranes of 10, ton capacity for locating hollow, core slabs in TAT Commercial Complex Project, Perlite Construction Company, 2013, 2014.

 

The gantry crane: left) CAD modeling, right)one of the fabricated gantry cranes

9.      Bridge cranes

Design and supervising the fabrication of bridge cranes of 16, ton capacity, Perlite Construction Company, 2012, 2013.

 

The bridge crane: left) CAD modeling, right)one of the fabricated bridge cranes

.A conveyor for transporting concrete

Design and supervising the fabrication of a conveyor for transporting concrete for about 72 meters of length in TAT Commercial Complex Project, Perlite Construction Company, 2013.

 

The fabricated conveyor for transporting concrete

10.  A bogie for transporting hollow, core slabs

Design and supervising the fabrication of a bogie for transporting hollow, core slabs in TAT Commercial Complex Project, Perlite Construction Company, 2013.

 

The bogie for transporting hollow, core slabs: left) CAD modeling, right) the fabricated bogie

11.  A drilling machine

Design and supervising the fabrication of a drilling machine for digging inverted pendulum of Seymareh Dam, Ilam, west of Iran, Perlite Construction Company, 2007.

 

 

The drilling machine: left) CAD modeling, right) the fabricated machine

 

 

12.  An expandable trailer

Design and supervising the fabrication of an expandable trailer for transporting bridge beams (15, meter to 22, meter), ChahBahar, Nikshahr main road project, Iran, Perlite Construction Company, 2004.

The fabricated expandable trailer

13.  Concrete buckets

Design and supervising the fabrication of six units of concrete buckets (1.5m3 capacity), TAT Commercial Complex Project, Perlite Construction Company, 2014.

 

.

CAD modeling of the concrete bucket and one of the fabricated buckets

14.  A telescoping system for a tower crane

Design and supervising the fabrication of a telescoping system for 180HC LIEBHERR tower crane, TAT Commercial Complex Project, Perlite Construction Company, 2014.

 

CAD modeling of the tower crane telescoping system and the fabricated system

15.  Jacquard machines

Design of a jacquard mechanical components and its dynamic modeling for controlling carpet design,

 

 

16.  Agricultural machinery (combined)

Design of a multi, task tillage and planter machine, August 2014, present

 

CAD modeling of the multi, task tillage and planter machine

 

 

17.  Mechanism design of 3D printer and experimental milling machine (3 axes) for education.

 

 

 

18.  Design and supervising the fabrication of a winch unit of 10, ton capacity, Perlite Construction Company, central site, 2014.

 

19.  Design and supervising the fabrication of a booster for increasing oil pressure from 100 bars to 1000 bars, Perlite Construction Company, central site, 2008.

20.  Design and supervising the fabrication of a Cartesian table for digging machine, Seymareh Dam, Ilam, west of Iran, Perlite Construction Company, 2008.

 

21.  Design of software for calculations of machining time, Perlite Construction Company, central site, 2007.

 

22.  Chariots for a tower crane

Two chariots for 630HC LIEBHERR tower crane, Iran Mall Commercial Complex Project, Perlite Construction Company, 2014.

 

23.  design and manufacturing long rich boom for excavator 375 (Caterpillar), full length with stick is 22 meter, Perlite construction company, 2015

 

24.  Design and manufacturing rolling machine for manufacturing Grouted Splice Sleeve Connection Perlite Construction Company. 2016.

Hot Roll Forming.jpg

25.  sign and manufacturing for changing wheel loader (Caterpillar 966 H) to lift truck machine for stepping precast column, tat mall project - Tehran - Iran, Perlite Construction Company.2016.

26.  Design and manufacturing upsetting machine for forging bar head for increasing bar head diameter and threading it for precast - tat mall project - Perlite construction company 2016.

DSC_0197.JPG

render.jpg

 

27. Design and manufacturing transporting machine for handling big precast components (weight 27 ton - length 18 meter), and it connected to the wheel loader. Tat mall project - Perlite Construction Company. 2016.

 

 

28. Design and manufacturing scalper machine tools for aluminum factory


DESIGN IN PROGRESS

1.      Tower belts for concreting broad fields

Design of a tower belt system which is going to transport concrete in fields of broad area, TAT Commercial Complex Project, Perlite Construction Company, 2013, present

Towerbelt for transporting concrete in broad fields

A sample of concreting field and location of designed towerbelts

 

2.      Design of boom and mast systems for a scrapped crane chase.

In this project we are going to use a scrapped crane (without boom, mast and hoisting system) as a base to have a crane of 350 ton capacity.

 

 

The scrapped crane chase and FEM analysis of boom section

 

Autodesk inventor modeling of boom and mast on the available crane chase (350 ton)

Dynamic simulation of the designed boom and mast on the crane with Simmech (Matlab)

 

 

 

3.      Furnace Tending Vehicle

Design of a vehicle for charging aluminum furnaces (with a maximum capacity of 6 tons of aluminum billets in each charge of a furnace), Perlite Construction Company, 2014, present.

CAD modeling of the designed furnace tending vehicle

 

 

4.      Design robot for setup hollow core (tat mall project , Tehran)

Design of a robot for locating hollow, core slabs (axial distance between columns in length is 18 meters and in width is 10 meters, with a maximum lifting capacity of 10 tons), TAT Commercial Complex Project, Perlite Construction Company, 2013, present

 

simulation

 

 

5.      Supervising for manufacturing a preheat furnace with 60-ton capacity of slabs for Aluminum factory.

6.      Design and modeling smart parking – (elevator and chariot) for lifting and moving vehicle for locating in special location in vertical parking.

 

 

7.      Manufacturing supervisor of preheat furnace for aluminum factory (SNAQ - Qazvin) (Design by EFER company).

8.      Wind turbine CAE modeling in ANSYS and MATLAB (3.2 MW) – taking part (SKY WIND (Germany) & Perlite construction Co.).

9.      Design and modeling a special climbing crane for assembling wind turbine towers and component.

10.  Design and modeling lattice boom crane with 1200_ton capacity (connect 2 lattice boom cranes (Manitowoc crane - series 7000) to each other).

11.  Design a special climbing crane for polishing concrete in dam structure.

12.  Design a special retract and expandable workshop for mobile workshop.